CMI’s urban development. The second phase of the Multi-Proyectos CMI urban development, begins construction as a symbol of new beginnings for many families, assures Juan Luis Bosch Gutiérrez.

Complying with its planning and with more than 85% sold of Tower 2, construction began on this new phase of the Master Plan San Isidro 2021, which has more than 3 blocks of amenities and green areas. The lifestyle in San Isidro 2021 is comfortable, spacious and surrounded by nature in one of the fastest growing and most valuable sectors of Guatemala City.

The construction of Tower 2 will generate more than 200 direct jobs and around 70 indirect jobs. The project represents an investment of more than US$10 million, which will inject dynamism into Guatemala’s economy.

This is a unique concept within the city and is located close to 2 gyms, 8 shopping centers, 5 supermarkets, 12 schools and 4 universities. Its location, on San Isidro Blvd. allows access to 3 roads: Cayalá via Blvd. La Montaña or Kanajuyú, to zone 5 down Calzada La Paz or to Carretera a El Salvador via Piedra Parada. Additionally, the entrance is very safe through the 6-lane digitalized checkpoint. From the open and illuminated spaces to the way the complex is managed, getting home is synonymous with tranquility.

Construction of the CMI Multi-Project phase begins

The Master Plan San Isidro 2021 has the support and confidence of the Multi-Projects brand, a Guatemalan company with more than 30 years of experience in the real estate sector and part of Corporación Multi Inversiones – CMI, a successful business group with experience in multiple industries and international presence.

Its attractive architecture seeks to maintain harmony with nature, with a development that has integrated organic elements, using contrasting natural materials that reinforce the concept.

“The design of the apartments offers functional spaces and aesthetic finishes and high quality. In addition, the apartment tower will have 14 levels, only 6 apartments per level with beautiful views and basement parking. This means that the more than 13 thousand square meters of construction, between basements and tower, have been amply utilized for the benefit of our clients.” Architect Pablo Solorzano Arathoon, director of the Real Estate Projects Unit of the prestigious group, commented.

The Master Plan already includes outdoor relaxation areas, changing rooms, areas for social events and piñatas, a barbecue area and tables, a gym, a five-a-side soccer field, trampoline and children’s play areas, as well as a pet park with a grooming and training area. The second phase will add more than 3,600 meters of amenities and green areas, including an ecological vegetable garden, the expansion of the jogging trail, half a basketball court and playground equipment.

Everything a family needs to say yes to a positive future!